Saturday, June 14, 2008

Friday

So Friday Katie took off and we spent the day doing work on the apartment. First things first Katie and I ripped up the tile in the Kitchen which was a pain. They put diamond lath on the floor and then cemented the tile to the floor. It was one of the worst demo jobs I have done. We then took the tile to the dump and started the rest of the day. Katie spent the first part of the day putting a second coat of primer on the bed room walls while I sanded the second coat of plaster on the walls. I then put the third and final coat of plaster on the wall and ceiling joint and spent the rest of the day leveling and hanging cabinets. At around 0930 our appliances were delivered and that is one thing crossed of the list .

Katie Taped the Window so she would not get any paint on the casing.

She also taped the door trim.

Picture of the base sink and dishwasher. The piece of wood between the dishwasher and the fridge is the wall the granite will sit on so it spans over the dishwasher.
Picture of the base cabinets with the 1/2 in plywood that is going to level the cabinets with the wall. Katie was nice enough to go out and pick up the plywood so we could be ready for the granite template tomorrow.
Picture of our new over the range Microwave.
There is a picture of the floor with no tile. Picture of our living room empty after the two dump runs.

No comments: