Well I have been pretty busy on the place and have gotten allot of work done. Friday afternoon I got into the place and picked up some sheet rock and had at it sheet rocking the walls that needed to be sheet rocked. It went pretty easy with the walls but the strip in the celling and wall from the demo was a different story. The apartment has .25in sheet rock with a cement finish of varying thickness then a thin layer of plaster over that. It was very hard to match the thickness with sheet rock so I had to fill it in with 1/2 in sheet rock. Monday I will put up some diamond lath and plaster the space. It was going great but my shop vac died so there is sheet rock dust all over the apartment. I did some cleaning and called it a night. I will post pictures when I get home.

Here is a picture of the space in the wall that I need to fill. Its an odd ball thickness so I am going to have to finagle some things to make it work.

Here is picture of the hole in the ceiling. I am going to put in 1/2 in sheet rock strips and diamond lath and fill in the space to level it out.

Picture of the inside of the cabinet casing sheet rocked. It is going to bear the weight of the granite when it comes.

Here is a picture from the living room of the finished sheet rock. I laid the sheet rock Friday.
No comments:
Post a Comment